mirror of
https://github.com/The-Low-Code-Foundation/OpenNoodl.git
synced 2026-01-12 07:12:54 +01:00
3.6 KiB
3.6 KiB
TASK-002 Changelog: Legacy Project Migration
[2025-07-12] - Backup System Implementation
Summary
Analyzed the v1.1.0 template-project and discovered that projects are already at version "4" (the current supported version). Created the project backup utility for safe migrations.
Key Discovery
Legacy projects from Noodl v1.1.0 are already at project format version "4", which means:
- No version upgrade is needed for the basic project structure
- The existing
ProjectPatches/system handles node-level migrations - The
Upgradersinprojectmodel.tsalready handle format versions 0→1→2→3→4
Files Created
packages/noodl-editor/src/editor/src/utils/projectBackup.ts- Backup utility with:createProjectBackup()- Creates timestamped backup before migrationlistProjectBackups()- Lists all backups for a projectrestoreProjectBackup()- Restores from a backupgetLatestBackup()- Gets most recent backupvalidateBackup()- Validates backup JSON integrity- Automatic cleanup of old backups (default: keeps 5)
Project Format Analysis
project.json structure:
├── name: string # Project name
├── version: "4" # Already at current version!
├── components: [] # Array of component definitions
├── settings: {} # Project settings
├── rootNodeId: string # Root node reference
├── metadata: {} # Styles, colors, cloud services
└── variants: [] # UI component variants
Next Steps
- Integrate backup into project loading flow
- Add backup trigger before any project upgrades
- Optionally create CLI tool for batch validation
[2025-01-XX] - Task Created
Summary
Task documentation created for legacy project migration and backward compatibility system.
Files Created
dev-docs/tasks/phase-1/TASK-002-legacy-project-migration/README.md- Full task specificationdev-docs/tasks/phase-1/TASK-002-legacy-project-migration/CHECKLIST.md- Implementation checklistdev-docs/tasks/phase-1/TASK-002-legacy-project-migration/CHANGELOG.md- This filedev-docs/tasks/phase-1/TASK-002-legacy-project-migration/NOTES.md- Working notes
Notes
- This task depends on TASK-001 (Dependency Updates) being complete or in progress
- Critical for ensuring existing Noodl users can migrate their production projects
- Scope may be reduced since projects are already at version "4"
Template for Future Entries
## [YYYY-MM-DD] - [Phase/Step Name]
### Summary
[Brief description of what was accomplished]
### Files Created
- `path/to/file.ts` - [Purpose]
### Files Modified
- `path/to/file.ts` - [What changed and why]
### Files Deleted
- `path/to/file.ts` - [Why removed]
### Breaking Changes
- [Any breaking changes and migration path]
### Testing Notes
- [What was tested]
- [Any edge cases discovered]
### Known Issues
- [Any remaining issues or follow-up needed]
### Next Steps
- [What needs to be done next]
Progress Summary
| Phase | Status | Date Started | Date Completed |
|---|---|---|---|
| Phase 1: Research & Discovery | Not Started | - | - |
| Phase 2: Version Detection | Not Started | - | - |
| Phase 3: Migration Engine | Not Started | - | - |
| Phase 4: Individual Migrations | Not Started | - | - |
| Phase 5: Backup System | Not Started | - | - |
| Phase 6: CLI Tool | Not Started | - | - |
| Phase 7: Editor Integration | Not Started | - | - |
| Phase 8: Validation & Testing | Not Started | - | - |
| Phase 9: Documentation | Not Started | - | - |
| Phase 10: Completion | Not Started | - | - |